Advisory: Road closure in Labasa due to speed hump installation

Listen to this article:

James Madhavan road in Labasa will be on closedown until 4am on Monday, January 27 to allow concrete curing. Picture: SUPPLIED/FRA

MEMBERS of the public are advised that installation of speed humps will be carried out from today at the James Madhavan road in Labasa.

According to a Fiji Roads Authority (FRA) statement the road will be on closedown until 4am on Monday, January 27 to allow concrete curing.

“Traffic will be diverted onto Salusalu Street through the unsealed back road behind Bethel Primary School onto Nadawa and back onto James Madhavan Street,” FRA said.

“This will also happen vice versa for traffic from the opposite end.

“We will appoint flagmen at each detour points to control traffic and advise motorists.

“Saw cuts and trenching works will start at 7pm continuing through the night and we will pour concrete on Sunday morning.

“Full traffic control will be in place throughout this period.”

For further queries please contact FRA Toll Free number on 5720.

 

Array
(
    [post_type] => post
    [post_status] => publish
    [orderby] => date
    [order] => DESC
    [update_post_term_cache] => 
    [update_post_meta_cache] => 
    [cache_results] => 
    [category__in] => 1
    [posts_per_page] => 4
    [offset] => 0
    [no_found_rows] => 1
    [date_query] => Array
        (
            [0] => Array
                (
                    [after] => Array
                        (
                            [year] => 2023
                            [month] => 12
                            [day] => 28
                        )

                    [inclusive] => 1
                )

        )

)

No Posts found for specific category