Water relief plan for Mali

Listen to this article:

An aerial view of Ligaulevu Village on Mali Island in Macuata. Picture: SUPPLIED

A LONG-TERM solution to water shortages affecting two villages in Mali district in Macuata has been identified, with consultations underway with landowners before the project can proceed.

While Vesi Village continues to have a reliable water source, acting commissioner Northern Apolosi Lewaqai said Ligaulevu and Nakawaga villages remained vulnerable during prolonged dry periods.

“The Vesi Village water source remains relatively reliable, with adequate water catchment capacity to meet the community’s needs throughout most of the year,” he said.

Mr Lewaqai said Ligaulevu and Nakawaga depended mainly on groundwater boreholes and rainwater harvesting systems.

“During prolonged dry periods and drought conditions, water shortages are experienced in both villages.

“To ensure continued access to safe water, the (Waterways) ministry supports these communities by providing fuel assistance for the transportation of water from the mainland, specifically from Mali and Vorovoro.”

He said the Government had strengthened water security by installing water storage tanks in the three villages.

“As a long-term and sustainable solution, a potential water source has been identified at Matalabasa.”

He said the Mali district representative and village elders had started consultations with relevant landowners to obtain consent.

Upon securing the landowner agreements, he said the Water Authority of Fiji would be engaged to undertake assessments, scoping and engineering design works for the proposed water supply scheme.