TAMAVUA water supply remains restricted, with production at the Tamavua Water Treatment Plant operating at just 61 per cent despite repairs to a faulty pump at the Waimanu Raw Water Pump Station.
The Water Authority of Fiji (WAF) said one of the four pumps at the station was repaired at 2am on Tuesday, restoring the station to full operating capacity.
However, reduced raw water availability from the Savura catchment and Headworks 3 (HW3), caused by El Niño, continues to affect water production.
WAF said the restricted supply was affecting the Lami to Togalevu corridor, Mead Road, elevated areas of Samabula and elevated Tamavua.
“Production at the Tamavua Water Treatment Plant currently stands at 61 per cent which continue to impact the following areas,” the authority said.
WAF said existing valve operations were showing steady improvement and teams would continue monitoring the system as efforts continued to restore normal supply.
Water carting trucks had also been deployed across the Central and Eastern divisions to assist affected customers.
The authority urged residents to maintain water storage for drinking and cooking during the restricted supply period.


