FRA impressed with work progress by two contractors

Listen to this article:

FRA chief executive Jonathan Moore at the work site along Kings Road in Nausori. Picture: SUPPLIED

THE Fiji Roads Authority is impressed with the ongoing works by their two contractors — Higgins Fiji and Dayals Quarries involved in the S3-4 lane road project between the Rewa Bridge in Nausori and 9 Miles.

FRA chief executive officer Jonathan Moore visited the project site on Friday and said he was impressed by the work of the two contractors.

“These two contractors are far quicker with far better quality of delivery and responsiveness than our previous contractors,” Mr Moore said.

More details on this story, read today’s (Sunday, January 20) edition of The Sunday Times.

Array
(
    [post_type] => post
    [post_status] => publish
    [orderby] => date
    [order] => DESC
    [update_post_term_cache] => 
    [update_post_meta_cache] => 
    [cache_results] => 
    [category__in] => 1
    [posts_per_page] => 4
    [offset] => 0
    [no_found_rows] => 1
    [date_query] => Array
        (
            [0] => Array
                (
                    [after] => Array
                        (
                            [year] => 2023
                            [month] => 12
                            [day] => 29
                        )

                    [inclusive] => 1
                )

        )

)

No Posts found for specific category